top of page
ALMOST DAILY VLOG


DAY 4 - BUILDERS, BR-030, AND THE REALITIES OF A CONSTRUCTION SITE IN RURAL BRAZIL
Finding the contractor became a saga. Photo: Reproduced from Carlos Alberto Maier Building in Algodões required someone who understood sandy soil, high humidity, protected vegetation, lateral rain, and the reality of transporting materials via BR-030 — a challenging road that defines logistics in the region. That was how we met Alcinei. He showed us previous projects. When building outside major cities, references matter more than Pinterest. His work was solid and practical.

Nancy Silva
Feb 281 min read


DAY 3 — A PROJECT THAT DIDN’T FIT THE BUDGET
Square meters and reality. We arrived in Maraú with a dream, a full architectural project, and a rented car. In our optimistic timeline, we would move in within a year. The original design had two floors and over 300 square meters. That was when we understood the real cost of building in coastal Bahia. Sandy soil. High groundwater. Difficult logistics. Limited transport. Costs doubling quickly. And as we began living there, it became clear the house was too aggressive for the

Nancy Silva
Feb 281 min read
bottom of page
